This part of IEC 62600, which is a Technical Specification, describes the required methods and the required conditions to determine the power performance of the WEC 2 in Location 2, possibly at a different scale and with configuration changes to accommodate the new site conditions, in all cases based on measured power performance of WEC 1 in Location 1. This technical specification allows for assessment at Location 1 or Location 2 based on limited/incomplete data material, as long as this is accompanied by a validated numerical model or physical model and assessment of the uncertainty involved. Another key element is transparency in the assessment.
This technical specification includes:
- Specification of data requirements needed from the original measurements at Location 1 including an assessment of the uncertainty involved (if based on limited/incomplete data material) in addition to those specified in IEC TS 62600-100 and IEC TS 62600-101.
- Limitation on the changes that are allowed to the WEC and the specification of the location.
- Wave data required at Location 2, as a minimum the requirements found in IEC TS 62600-101.
- Development of the power matrix at Location 2.
- Validation of the power matrix at Location 2.
- Assessment of uncertainties in the derived performance parameters at Location 2.
- Requirements for the allowable power performance transfer by geometric, kinematic and dynamic similarity.
- Requirements for the allowable incorporation of additional empirical model data.
- Requirements for the allowable incorporation of additional numerical model data.
The technical specification does not cover the following items:
- The original data measurement at Location 1 (see IEC TS 62600-100).
- Environmental concerns.
- Operation and maintenance.
Cross References:
IEC TS 62600-1
IEC TS 62600-100
IEC TS 62600-101:2015
IEC TS 62600-2
All current amendments available at time of purchase are included with the purchase of this document.