The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation.
It is not the intention of this Technical Specification to define how production-based availability shall be calculated. Nor is it the intention to form the basis for power curve performance measurements, which is the objective of IEC 61400-12.
This document also includes informative annexes with:
- examples of determination of lost production,
- examples of algorithms for production-based indicators,
- examples of other performance indicators,
- examples of application scenarios.
Cross References:
IEC 60050
IEC TS 61400-26-1:2011
IEC 61400-1:2005
IEC 61400-12-1:2005
IEC 61400-12-2:2013
IEC 61400-25-1:2006
IEC 61400-25-2:2006
IEC 61400-25-3:2006
IEC 61400-25-4:2008
IEC 61400-25-5:2006
IEC 61400-25-6:2010
ISO 3977-9:1999
IEEE 762:2006
All current amendments available at time of purchase are included with the purchase of this document.