This Standard sets out the warm water (55°C) method for the accelerated curing of compression test specimens of concrete, made in the laboratory, and moulded in accordance with AS1012.8.1. Specimens are tested between 26h and 28h from time of batching. The method requires that the specimens be prepared adjacent to the curing tank.
AS 1012.19.2-2000
$17.00
Methods of testing concrete, Method 19.2: Accelerated curing of concrete compression test specimens – Warm water method
Category: AS