This Practice provides requirements for the installation of monolithic refractory linings in process equipment and piping. Included are preparation, installation, curing, and repair of the linings. This Practice also covers heat dryout of newly installed or repaired linings.
PIP RFSM2000
$75.00
Monolithic Refractory Installation Specification (Technical Revision)
Category: PIP
Related products
$600.00