Describes installation procedures for temporary power at construction sites. It covers the planning, installation, expansion, maintenance, cutover, and removal of temporary power systems operating at 600 volts or less. NECA 200 is approved as an American National Standard (ANS).
NECA 200-2010
$20.00
Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI)
Category: NECA
Related products
$20.00