It defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. The scope of this standard is limited to: – a model of the activities associated with manufacturing operations management, Level 3 functions; – an identification of some of the data exchanged between Level 3 activities.
IEC 62264-3 Ed. 1.0 b:2007
$187.00
Enterprise-control system integration – Part 3: Activity models of manufacturing operations management
Category: IEC